| BEFORE |
![]() |
| Another BEFORE |
![]() |
| 5 jacks in a 6 hole plate. Hole was opened/closed back by electrician. |
![]() |
| Hole to bring wire from 1st floor to 2nd floor. I installed blank cover for future access. |
![]() |
| Opening in ceiling 2nd floor just above network room on 1st floor. I added a blank plate for future access. |
![]() |
| I added an access panel door, and left a spare in the ceiling. |
![]() |
| Emptied out the network closet. |
![]() |
| New rack installed, and everything patched in. |
![]() |
| Blue jacks are new runs. Black wires come from wall mounted patch panels. |
![]() |
| Another angle of the completed network rack. |
![]() |
| Yet another angle of completed network, |
![]() |
| Yet one more angle of completed network. |
![]() |
| This is why I like doing this after hours, my tool bags can get messy |
![]() |
| This is my mess, |
![]() |
| Don't worry I cleaned up best I could after I took this pic. |