4 wall mounted 8u racks installed and patched in

So this customer had someone else run all of the wiring. I would probably have run all of the wiring to a single location in this room and installed everything on a single floor mounted rack, but since everything was already wired behind plywood walls (and not run in from the ceiling, so not sure how to pull back to reroute) I decided to install 4 wall mount 8u racks.

Four racks ready to be mounted
Ready to mount everything to walls
One of the GB racks.
All 4 racks mounted, almost finished wiring up
One of the PoE racks
Finishing up wiring HD jacks to patch panel.
One of the GB racks.
Panoramic view of all 4 racks. 