Pre-wiring 86 cables for a new construction. Office is on the 2nd floor, data closed will be located on the first floor where the current phone system is located. Several thousand feet of wire, aprox. 1-1/2 day labor to get all cabling installed.
86 cables pulled. |
Another view of the 86 cables. |
Strapping the cables up, getting ready to bring them downstairs. |
1/3 of the cables run down one side of the ceiling. |
1/3 of the cables run down the other side of the ceiling. |
pre-wired for a door phone + access control. |
Pre-wired for voice and data jacks. |
All 86 cables pulled into what will become the network closet on the first floor, and rolled up. |