This is the end of the run. |
I drilled small holes in the top of the wire molding to pass 2 wires for each jack. |
Nothing left to waste. In the boiler room I used scrap pieces to secure the wires to the wall. |
Even the power is run through the wire molding. |
Aris Cable modem (left) 8 port TP-Link switch (middle top) 12-port Patch panel (middle bottom) Linksys/Cisco E1200 router (left) |
No comments:
Post a Comment