Sometimes the simple jobs are the most complicated. This customer recently had another tech from our company come out and install the VoIP phones for the customer, but the customer required 3 door phones and an overhead paging set up.
When I first arrived, I did what I had to and got the door phones and relays set up, so that the customer could begin using our VoIP service to answer the door phones and buzz people into the office doors. Prior to doing this I had to replace the router. This took about 2 1/2 hours. It should have taken much less time to accomplish this since they had existing door phones and wiring, but their network was in complete disarray when I first arrived.
From previous experiences, I no longer work on or leave networks in this condition, especially for new customers. So the entire network was cleaned up. Switches, and other equipment that was just sitting on a shelf with wires all bunched up were all wall mounted, and the wiring was neatened up as much as is possible with a live network during business hours. I am, as always, not 100% satisfied with the final product compared to how I would have designed it had I done it from scratch, however it impressed the customer enough to provide a gratuity, which is always appreciated, and I feel it is as neat as possible giving the circumstances.
Unfortunately my "before" photos were not taken until after I had already mounted the new router and 3 door phone relays, however almost everything else has so far been untouched in my "before" images.
BEFORE: Switches and routers sitting on shelf, patch cords a complete mess! |
BEFORE |
AFTER: DVR was pushed further back onto shelf, leaving some usable space. Power cords and DVR power supply were the only things left untouched and unmounted. |
I love this. I've seen very similar installations myself. I've quoted you on my own blog. http://ijnet.co.uk/a-right-mess-cleaned-up/
ReplyDeleteKind regards
Ian
was not the messiest, nor am i completely satisfied with the end product, but i did what i could within the few hours that i was there to do my installation with minimal disruption to the network during business hours, and i did not even touch any of the power cords or wires (which is the big ball of mess on the shelf in my after images)
Delete