I had to return to the customer who decided to run all of their wiring AFTER the new building's construction was completed. Here is a before and after of what it looked like before I left on the first visit - more info/pics can be seen of this job HERE
All of the contractors were complaining about this place. The original electrician. The new electrical contractor who was there today, installing yet more CAT5 cabling, the plumbers who were there last time that had to fix a leak from a previous plumbing contractor.
I only spent about 2 hours here today, testing and labeling, installing the router/switch and patch cords, and moving the FiOS router (upstairs behind the bar, not photographed)
With everything going on with this job, using wiring pulled by someone else, having to extend or splice and re-route CAT5 drops only a single brown/white pair failed. Since it was not the green or orange pair I just labeled that jack "no-PoE" and kept it moving.