DUE TO ISSUES WITH GOOGLE PHOTOS ALL IMAGES AFTER AUGUST 2015 ARE NOT SHOWING, I AM TRYING TO FIGURE OUT HOW TO GET THIS WORKING!

Saturday, August 27, 2011

Hurricane Irene

Found this interesting:

The governor declared a state of emergency and the state's Office of Emergency Management has increased staffing in its underground bunker.       

If they anticipate the possibility of FLOODING, why would they be increasing staffing at an UNDERGROUND bunker? Shouldn't the resources be diverted elsewhere, such as high ground?


Thursday, August 25, 2011

I have got another (aprox.) 60 cable job that I recently pre-wired for new construction. I did not get photos of the cabling portion of the job, but will make an attempt to get images of the completed project once they finish the drywall.

UPDATE 9/1/11: Here it is: http://blog.nyphonejacks.com/2011/09/yes-i-really-am-that-busy-57-runs.html

pre-wire 86 cables.


















Pre-wiring 86 cables for a new construction. Office is on the 2nd floor, data closed will be located on the first floor where the current phone system is located. Several thousand feet of wire, aprox. 1-1/2 day labor to get all cabling installed. 

86 cables pulled. 

Another view of the 86 cables. 

Strapping the cables up, getting ready to bring them downstairs.

1/3 of the cables run down one side of the ceiling. 

1/3 of the cables run down the other side of the ceiling. 

pre-wired for a door phone + access control. 

Pre-wired for voice and data jacks.

All 86 cables pulled into what will become the network closet on the first floor, and rolled up. 

17 jacks, 4 cameras + access control install















[EDIT: Wiring diagram to connect PAP2 to RC2a and E20B doorphone can be found HERE] 

I had initially put in a bid to install a rack mount for the patch panel and network equipment. The customer decided that they wanted everything on a shelf. CAT5 runs to 9 locations, each location, except one, has 2 CAT5 drops. Since I used 2-12 port patch panels I labeled one panel "A" and one panel "B" and punched down each location with the same jack number on each panel.

The monitor has been wall mounted, but has not been photographed (as of yet). The customer provided the hardware for the door phone, but all other hardware is new. There is nearly 2,000 ft. of wire run on this install with very little excess.

Awaiting electrician bringing power to the network shelf, and for the cable company to install the cable modem. DSL jack was pre-wired to NID, but likely will not initially be used.

I wanted to install a rack mount, but the customer wanted a shelf.
Monitor has since been mounted, have not photographed yet.
Network equipment not yet installed awaiting electrician and internet service.

2 - 12 port patch panels.
Viking RC2A door controller.
Linksys PAP2.
Duplex jack for DSL and door phones.

4 output camera power supply.

Each location has 2 CAT5 jacks.
To right wall mounted jack.
To left cabling pulled with electrical conduit on brick wall, surface mount jack.
Wires have since been strapped to conduit.

One of the 4 cameras. 

E-20B door phone. 
Customer provided door phone, relay, door strike (not photographed) and PAP2.

  















UPDATE: 9/1/11 Got another photo of the completed network shelf and mounted monitor.

Everything installed - going to need an additional switch.
Still awaiting DSL and Cable modem installation,
oh... and my payment.