Pre-wiring 86 cables for a new construction. Office is on the 2nd floor, data closed will be located on the first floor where the current phone system is located. Several thousand feet of wire, aprox. 1-1/2 day labor to get all cabling installed.
![]() |
| 86 cables pulled. |
![]() |
| Another view of the 86 cables. |
![]() |
| Strapping the cables up, getting ready to bring them downstairs. |
![]() |
| 1/3 of the cables run down one side of the ceiling. |
![]() |
| 1/3 of the cables run down the other side of the ceiling. |
![]() |
| pre-wired for a door phone + access control. |
![]() |
| Pre-wired for voice and data jacks. |
![]() |
| All 86 cables pulled into what will become the network closet on the first floor, and rolled up. |